Calculate the materials usage variance using the following information: Total budgeted cost of material A = PKR 25,000. Total actual cost of material A = PKR 37,600. Standard usage of material A in production = 5,000 units. Actual usage of material A in production = 4,700 units.

  • A.PKR 1,500 (Adverse)
  • B.PKR 1,500 (Favorable)
  • C.PKR 1,250 (Favorable)
  • D.None of these